The Villages of Loreto Bay, B.C.S., Mexico

Loreto Bay
Owner
The Loreto Bay Company
Architects
Moran Architects
Engineer
Tor Hansen, P.Eng
Status
Ongoing
Description
Design-build project.

Chateau Lake Louise, Lake Louise, Alberta

Chateau Lake Louise
Owner
Fairmont Hotels & Resorts
Architect
CPV Group Architects & Engineers Ltd.
Engineer
Tor Hansen, P.Eng
Status
Completed February 2005
Description
Design-build project.

Brentwood Bay Lodge, Victoria, B.C.

Brentwood Bay Lodge
Owner
Brentwood Bay Lodge
Architect
VIA Architecture
Engineer
Yoneda & Associates
Status
Completed
Description

Vancouver Island Technology Park, Victoria, B.C.

VITP
Owner
BC Buildings Corporation
Architect
Idealink / Bunting Coady Architects
Engineer
Keen Engineering
Status
Completed
Description
VITP is the first LEED® building to be certified in Canada and only the third LEED version 2.0 Gold building in the world. The BC Buildings Corporation is using this project as a case study for their work in developing the LEED certification system for broader use in British Columbia.

Shoal Point at Fisherman's Warf, Victoria, B.C.

Shoal Point
Owner
Huron Street Management
Architect
Merrick Architecture / Wagg & Hambleton Architects
Engineer
Tor Hansen, P. Eng
Status
Completed September 2000
Description
A luxury condominium with 161 suites, underground parking and two levels of Marine Commercial space. Water to air heat pump units with heat supplied from gas fired boilers and heat rejected to exterior water features.

Hotel Grand Pacific, Victoria, B.C.

Clearion Hotel Grand Pacific
Owner
The Sun Group of Companies
Architect
Engineer
Tor Hansen, P.Eng
Status
Completed May 2001
Description
Ten stories, 175 room addition to existing downtown hotel with underground parking, two restaurants, banquet rooms, reception and meeting rooms. Four pipe fan coil units with water cooled chiller, cooling tower and hot water boilers.

Selkirk Waterfront Offices for BCBC, Victoria, B.C.

Selkirk Waterfront Offices
Owner
AXOR Construction
Architect
Engineer
Tor Hansen, P.Eng
Status
Completed June 1996
Description
160,000 ft2, five stories office buildings on common underground parking facility. Three roof mounted VAV units with DX cooling and VAV reheat boxes along the perimeter. Main floor strorefromt offices provided with water/air heat pumps.

Pacific Activity Centre, Esquimalt, B.C.

Pacific Activity Center
Owner
DND
Architect
Engineer
Tor Hansen, P.Eng
Status
Completed May 2000
Description
15,000 ft2

St. Patricks Church, Victoria, B.C.

St. Patricks Church
Owner
Huron Street Management
Architect
Engineer
Tor Hansen, P.Eng
Status
Completed September 1998
Description

NATO Flying Training Canada, CFB Moose Jaw, Saskatchewan

NATO-Flying-Training Canada
Owner
Bombardier
Architect
Engineer
Tor Hansen, P.Eng
Status
Completed July 1999
Description
100,000 ft2 facility at CFB Moose Jaw, consisting of office spaces, library, briefing rooms, classrooms and four flight simulators. Multiple air handling units with DX cooling and VAV control. Perimeter hot water radiant panel system supplied from central hot water boiler.

Air Terminal Building, Sandspit Airport, Sandspit, B.C.

Air Terminal Building
Owner
Transport Canada
Architect
Engineer
Tor Hansen, P.Eng
Status
Completed June 1995
Description
15,000 ft2 f air terminal building with holding room, concourse offices and loading area. Four pipe fan coil units supplied from central ground source heat pump supplemented by a small hot water boiler.

Gulf Island Secondary School, Ganges, B.C.

Gulf Island Secondary School
Owner
School District # 63
Architect
Engineer
Tor Hansen, P.Eng
Status
Completed June 1995
Description
93,000 ft2 secondary school with gymnasium, 200 tons of ground water source heat pumps using 75,000 ft of pipes buried below the playgrounds as heat source, heat recovery ventilation and CO2 controls. 1995 Power Smart Design Excellence Winner.